Jose A. Loera
41305 N.
Bayview Dr.
Antioch, IL 60002
Phone: (630) 390-9193 loerajose@gmail.com
SUMMARY: I have 15 Years
of experience in the Telecommunications industry. My work ethic, quality and
attention to detail was recognized by Ericsson and included in their training
class for “Basic Installation technique (NBSS Tech Training Rev 2.4 |
Ericsson Internal | 2014-01-20 | Page 237). I am seeking a position of
responsibility, challenge and professional growth where I can utilize, and
upgrade my current skills as an Technician/Engineer, Auditor, Trainer,
Project coordinator or Field manager working my way into Project Management.
EDUCATION:
APPLIED
SCIENCE IN ELECTRONICS PROGRAM
DeVry
Institute of Technology CHICAGO,
IL
Associates of Applied Sciences in Electronics GPA 3.3/4
CERTIFICATIONS:
Nokia
Wave 4 installation and commissioning Dallas,
TX 07/2014
AT&T
DUL to DUS Modernization certification Itasca,
IL 04/14
Ericsson
LTE Commissioning Delta Certification & Level III Badge (LZU1087803R2A) Richardson,
TX 04/14
Ericsson
Basic Installation Technique Certification & Level III Badge Richardson,
TX 04/14
AT&T
LSO Training & Certification Chicago,
IL 08/2013
Supplier
Awareness – Network Space. Course Number 60007518.
Ask
Yourself. Course Number 51247894.
Best
Practices: MOP. Course Number 60398555.
Quality
Installation NPE (TP76300). Course Number 60065363
Ericsson
Verizon AWS certification (CVLV9140001) Ericsson:
Addison, IL 06/2013
Ericsson
Tmobile LTE / RBS6000 certification (LZU1088658R1B) Ericsson:
Piscataway, NJ 02/2013
Andrews
LDF4 certification
Richmond, VA 05/2011
NORTEL
HS-1 EVDO Test, turn up and commission.Butler
Training facility Dallas, TX10/06
B.I.C.S.I.
Certification Indianapolis, IN 02/2000
EMP
America
- Medic First Aid Training (CPR Inclusive) Issued
12/11/99 Retraining 12/01
EXPERIENCE:
MPE / EME
Test Technician/ Telnet INC – Illinois / Wisconsin –
Sprint 12/2014
to 08/2015
•
Primary
role was to Test and record Sprint antenna EME RF output levels using Narda
NBM 550 Safety Test Solutions RF meter and equipment.
•Completed
hand site sketches and worksheets associated per site
•Uploaded
reformatted pictures and close out packages per site
•Added
RF emissions signage, barriers and supports where necessary
•
Coordinated inventory and storage needs
Auditor /
QA – Trainer – Lead Troubleshooter – RMA and Inventory manager – Drive Tester
Nokia
/ US Cellular - (Wave 4) Nebraska, Iowa & Missouri . (Wave 3)
Illinois. 10/2013 to 12/2014
•
Primary
role was to do internal post installation audits for 50-100% of each
respective market.
•
Document and submit daily report of defects found.
•
Repair or resolve any issues found with Wave 4 LTE (730, 850 &1900) &
AWS (2100) installation, commissioning or close out package. Made sure site
was ready for hand off / submission to client.
• Address
any punchlist items submitted by Nokia.
• Also
assisted with US Cellular integration cut over’s.
• Secondary
role was to assist with new market deployments, orientations and
presentations.
• Trained
new Installers and Integrators. Provided new update training for new market
changes.
•
Alerted the techs to their mistakes. Indentified “Repeat offenders” and
provided supplemental training where needed.
•
3rd
concurrent role I Tracked, collected & inventoried defective radios and
modules. Submitted, managed, tracked, delivered and received Nokia RMA’s.
•
Wave 3 Nokia NSN LTE Drive testing. Utilizing Streets & trips, JDSU
E6474A, Netpersec and putty to capture and record SINR, RSRP & CQI data.
Field
Engineer
05/2013 to 06/2014
Orin
USA / Ericsson-Verizon , At&t / Sprint-Samsung
• Configured
Samsung SMM-BMD010 & SMM-2LD000 Cabinets for Sprint Networks.
•Installed
and loaded ASR 901 & MWR 2941 Routers for Samsung/Sprint and MDR 8000 for
At&t.
•Loaded
and upgraded UAMA, CIMA-A, CICA-A, CICA-D & L9 cards for Samsung/Sprint.
•
Completed Verizon AWS Upgrades on Ericsson 6201 Cabinets for 3 and 6 sector
sites And Ericsson 6601 1C and 2C for At&t.
•
Added new Ericsson Radio shelves and DUS/DUL modules for new sector
expansions for At&t & Verizon.
•
Mounted Frames to various types of wall, floors, and Outdoor cabinets based
on floor plans For At&t & Verizon. Mounted GPS antennas to Ice
Bridges, Walls and Poles as required.
•
Ran, dressed and terminated Ground, power, alarm and fiber cables for
At&t, Verizon & Sprint.
•
Added Vertical and Horizontal ladder racks to walls and overhead for Verizon.
•
Did 3rd party
audits and repairs for final closeouts for At&t & Samsung.
•
Call test sectors, E911/PSAP, soft handoffs, Speedtests for Verizon as well
as NEA for At&t.
•
Drivetest for NSN using JDSU E6474A&NetPerSec.
Wireless
Field
Engineer
02/2012 to 03/2013
Altitude
Staffing - Tmobile, At&t, Sprint & Samsung.
Ericsson
& Tmobile: New York & New Jersey. At&t: Virginia
& Philadelphia. Sprint: Chicago.
•
Completed Samsung M1, M2, ATP 3g &4g assignments for Sprint.
•
Re-homed existing circuits and added new Voice and Data circuits for BTS
& NIU/NID
•
Completed new power upgrades for Ericsson PBC 6500 -48v power plants, battery
backups and new Ericsson Air Antennas.
•
Installed new Ericsson RBS6131, 6601, 6102 & 6201 LTE, UMTS, PCS &
GSM coax and fiber units. All wiring and custom CAT 6 and T1 cabling for
system completed onsite
•
Worked with Indoor/Outdoor/Hybrid 2c, 3a, 3b and 4a configurations for
Modernization / Rip & Replace.
•
Integrated new technologies and brought up new fiber circuits without exception.
•
Completed sector test calls and E911 PSAP/MTLR tests calls for all
technologies.
• Proficient in
Ericsson Element manager and OMT as well as Hyperterminal & FTP.
•
Have much exposure to troubleshooting all technologies including LMU &
GPS issues. Have a thorough understanding of most integration problems.
At&t:
Philadelphia, PA / Baltimore, MD / Washington
DC
•
Installed various components for At&t LTE systems including: FIF
Racks, Ladder racks and conduit, Ground Bars and surge arrestors, 1/0 +24v
power, RF cabling, Fiber cabling, New 66block and T1 cabling.
•
Installed & Integrated new Lucent NODE B cabinets
•
Installed –48v Converters and 4/0 cabling
•
Expanded and relocated existing Nokia Ultrasite cabinets.
•
Integrated new 850 & 1900 UMTS expansion cabinets.
•
Integrated LTE systems for Nokia & Ericsson GSM/UMTS cabinets.
•
Installed new battery strings.
•
Performed Power plant swaps and Hot cuts.
•
Harvested old Nokia Ultrasite cabinets & Various Power bays.
•
Completed Bechtel Safety training and standards.
Cell Site
Auditor/Surveyor & Field
Engineer
06/2009 to 08/2011
Redline
Telecom. Richmond,
VA
•
Installed +24v Power, Ground & Multimode fiber for At&t 4G Network
Interface Device. Also Installed FIF racks when needed.
•
Installed Cat 5 (4pair & 50pair) underground trunk Cabling, Surge
arrestors and terminated at new Dmarc and Smartjacks. Performed end to end T1
Testing and troubleshooting with switch.
•
Performed site surveys & audits of At&t Wireless locations.
•
Customize Coax LDF4/RG 8/RG 6/DS3 & Copper cat5 to 4/0 cabling to
specific
lengths
per engineering specifications.
•
Produced 2D AutoCAD / Visio floor plans from hand sketches and/or photos.
•
Did quality checks of recently installed Ericsson RRU, 3106 & 3206 UMTS
Cabinets, Ericsson 2206 & 2106 GSM Cabinets, Ground mounted amplifiers
and power plants.
• Repaired
or completed any discrepancies found during Quality assurance checks and full
site surveys. I would document and correct any imperfections in the
installations. I would submit Reports, photographic documentation and
AutoCAD/Visio surveys daily.
Facilities
Technician. Telx
Inc. Chicago,
Il 08/2007 to 12/2008
I would troubleshoot circuits
with use of JDSU test set, Multimeter, butt set or Light meters. Installed
signal boosters/repeaters and Wimax systems. I was Responsible for Quality
Assurance audits of all installations done by Telx employees or contractors.
I performed Pre-Installation audits, Report and track work by a standard form
of trouble tickets & work orders on a case by case basis. I was on
call for emergencies as needed. I was Responsible for the status and
completion of multiple projects. Provided a strong work ethic and working as
a member of a team for the success of the entire group.
•
Maintained various forms of X-Connections using cat5/ABAM (T1, ISDN, POTS,
DS1/data circuits), Coax (DS3 circuits) or Fiber Optics (OC circuits) in the “Meet-me-Room”
facility including suite to suite installations utilizing fire stopping
standards.
•
Maintain complex Fiber racks such as Alcatel 7432 to basic ADC 96+ fiber
Junctions. I performed Hardware installation of Fiber shelves, network
modules for Data, Voice and RF networks including power strips,
Frames/Cabinets/Inner-structure, cable management, and other Miscellaneous
customer equipment.
•
Did racking/stacking of servers and wiring network hardware for Wimax,
Intranet, VOIP and other types networks. Replaced and configured
hard drives, boards, SFP’s and power supplies on Cisco, HP and Dell Servers
as well as switches and routers.
Other
Skills & Side Jobs:
•
Replaced existing phone system for IBM / Lenovo at the Phillip Morris
Tobacco plant. Installed & tested a new Cisco phone system in multiple
facilities. Removed the Cisco ATA 186 & VG248. Installed, loaded &
Scripted Cisco VG202, VG224, 2951, and MCS servers. .
•
25yrs experience as a event promoter & DJ. Able to manage all
aspects of a project from concept to completion. Managed over 100 employees,
Managed crowd control for 1000+ guests, Served as promotions and marketing
director, Served as Project manager/Event coordinator.
•
FDA Licensed Laser show operator and designer. Experience in Repair,
Rigging, set up and operation of high power Class IV lasers.
References: Available
upon request.